Concept 1: DNS and Resolution

DNS determines which server a domain points to. Migration is essentially about changing a single DNS record.

  • First confirm the DNS record type (A, CNAME, MX).
  • Lower the record’s TTL in advance (e.g., 300 seconds) to shorten propagation time.
  • Handle the email MX record separately from the website DNS record—don’t change them together.

Concept 2: ICP Filing and Qualifications

  • Domestic servers require ICP filing; switching providers may involve updating the filing with the new provider.
  • The filing entity must match the domain owner.
  • A non-filed domain pointing to a domestic server will be blocked.

Before switching, confirm whether the new provider can take over the ICP filing.

Concept 3: Data and Files

Migration requires moving four types of content:

Type Content Notes
Database Table structure and data Ensure matching character set and version
Program Files Code, templates, configuration Paths and permissions
Upload Resources Images, attachments, certificates Large volume — upload first, then cut over
Environment Configuration Scheduled tasks, pseudo-static rules, SSL Easy to overlook

The items most easily missed are scheduled tasks and pseudo-static rules.

Concept 4: Environment Consistency

  • Are the PHP / runtime version and extensions consistent?
  • Are the database version and character set consistent?
  • Are the time zone, encoding, and upload size limit consistent?

Version mismatches can cause 'the code hasn't changed but the page still throws an error'.

Concept 5: Window Switching

  • Pick a low-traffic period (e.g., late night or weekend).
  • Run through the core workflow completely on the new server first.
  • After switching, immediately check the homepage, category pages, detail pages, and forms.

Concept 6: Rollback

  • Keep the old server for at least 7 days.
  • Retain old DNS records so you can switch back quickly.
  • If database writes occur after the switch, assess potential data loss before rolling back.

A migration without a rollback plan is not migration—it’s gambling.

Standard Migration Sequence

  1. Back up the entire site (code + database + uploads).
  2. Set up the environment on the new server and import data.
  3. Verify core functionality using a test domain.
  4. Lower TTL, then transfer static assets.
  5. Switch DNS and monitor for 1–2 hours.
  6. Once confirmed error-free, decommission the old server and old DNS records.