Client cases:Cloud Migration and Hardening for a Manufacturer
Background
The client ran a physical server in an old colo that went down a dozen times a year; a ransomware incident once encrypted a week of quotes.
What we did
Sized a 4-core 8GB cloud instance plus object storage backups, deployed HTTPS with SCDN to hide the origin IP, turned on WAF for SQLi and directory scanning, and set up nightly off-site backups.
Results
- Zero downtime during migration after 48 hours of parallel running
- Unplanned downtime down from ~26h to 1.5h per year
- High-severity vulnerabilities from 11 to 0
- Annual infrastructure cost down about 22%