Pre-Launch Checklist for Testing and Release Processes

Run through this list in the ten minutes before going live to catch most issues that would otherwise be discovered only after launch.

Insights:Pre-Launch Checklist for Testing and Release Processes

Checklist (10 Items)

# Check Item
1 Scope of this change is documented
2 Rollback plan is confirmed
3 Homepage and core pages are accessible
4 Forms and inquiry entry points are working
5 No 404 errors on key internal links
6 Database changes are backed up
7 Staging and production configs are aligned
8 Directory permissions and cache are handled
9 Release records are completed
10 Observation metrics are defined

Three High-Frequency Missed Items

Key Internal Links

New pages commonly have dead links; spot-checking 5 links before publishing will catch most issues.

Cache

If the template was changed but the cache wasn't refreshed, the page may appear unchanged.

Permissions

Failing to set permissions for a new directory will break upload functionality.

Smoke Test Checklist

Keep it under 8 items and finish within 5 minutes:

  1. Open the homepage.
  2. Open a list page.
  3. Open one detail page.
  4. Submit a form successfully.
  5. Login to the admin panel.
  6. Click one key internal link.
  7. Verify static assets load.
  8. View the site on mobile once.

What to Do During Observation

  • Check the error rate in the first 30 minutes.
  • Monitor core conversions in the first 2 hours.
  • Review logs for anomalies the next day.

Boundaries

This checklist is tailored for small to mid-sized sites. Teams with automated testing can integrate it into their CI/CD pipeline, but keeping a manual observation window is still recommended.

Related reading: