Insights:Pre-Launch Checklist for Testing and Release Processes
Checklist (10 Items)
| # | Check Item |
|---|---|
| 1 | Scope of this change is documented |
| 2 | Rollback plan is confirmed |
| 3 | Homepage and core pages are accessible |
| 4 | Forms and inquiry entry points are working |
| 5 | No 404 errors on key internal links |
| 6 | Database changes are backed up |
| 7 | Staging and production configs are aligned |
| 8 | Directory permissions and cache are handled |
| 9 | Release records are completed |
| 10 | Observation metrics are defined |
Three High-Frequency Missed Items
Key Internal Links
New pages commonly have dead links; spot-checking 5 links before publishing will catch most issues.
Cache
If the template was changed but the cache wasn't refreshed, the page may appear unchanged.
Permissions
Failing to set permissions for a new directory will break upload functionality.
Smoke Test Checklist
Keep it under 8 items and finish within 5 minutes:
- Open the homepage.
- Open a list page.
- Open one detail page.
- Submit a form successfully.
- Login to the admin panel.
- Click one key internal link.
- Verify static assets load.
- View the site on mobile once.
What to Do During Observation
- Check the error rate in the first 30 minutes.
- Monitor core conversions in the first 2 hours.
- Review logs for anomalies the next day.
Boundaries
This checklist is tailored for small to mid-sized sites. Teams with automated testing can integrate it into their CI/CD pipeline, but keeping a manual observation window is still recommended.
Related reading: